Wednesday, June 3, 2020

Exploiting Lean Manufacturing Techniques Management - 3300 Words

Exploiting Lean Manufacturing Techniques to Improve Street Lighting Management (Research Proposal Sample) Content: Exploiting Lean Manufacturing Techniques to Improve Street Lighting ManagementName Institutional Affiliation Table of Contents TOC \o "1-3" \h \z \u  HYPERLINK \l "_Toc478585692" Aim(s) and Objectives  PAGEREF _Toc478585692 \h 3 HYPERLINK \l "_Toc478585693" Study Aim  PAGEREF _Toc478585693 \h 3 HYPERLINK \l "_Toc478585694" Objectives  PAGEREF _Toc478585694 \h 3 HYPERLINK \l "_Toc478585695" Introduction  PAGEREF _Toc478585695 \h 4 HYPERLINK \l "_Toc478585696" Novelty of the Project  PAGEREF _Toc478585696 \h 5 HYPERLINK \l "_Toc478585697" A Preliminary Literature Survey  PAGEREF _Toc478585697 \h 6 HYPERLINK \l "_Toc478585698" Street Lighting as a Contributor to Heightened Operational Costs  PAGEREF _Toc478585698 \h 6 HYPERLINK \l "_Toc478585699" Street Lighting in Energy Wastage  PAGEREF _Toc478585699 \h 6 HYPERLINK \l "_Toc478585700" Change as the Way Forward: Technological Drivers of Street Lighting Management  PAGEREF _Toc478585700 \h 7 HYPERLINK \l "_Toc478585701" The Novel Twist: Application of Lean Manufacturing Techniques  PAGEREF _Toc478585701 \h 8 HYPERLINK \l "_Toc478585702" Autonomation  PAGEREF _Toc478585702 \h 8 HYPERLINK \l "_Toc478585703" Supplier Development  PAGEREF _Toc478585703 \h 8 HYPERLINK \l "_Toc478585704" Total Productive Maintenance  PAGEREF _Toc478585704 \h 8 HYPERLINK \l "_Toc478585705" Elimination of Waste  PAGEREF _Toc478585705 \h 9 HYPERLINK \l "_Toc478585706" Continuous Improvement  PAGEREF _Toc478585706 \h 9 HYPERLINK \l "_Toc478585707" Lean Tools in Application  PAGEREF _Toc478585707 \h 9 HYPERLINK \l "_Toc478585708" Proposed Approach and Methodology  PAGEREF _Toc478585708 \h 10 HYPERLINK \l "_Toc478585709" Evaluation and Testing Methods (Lean Test Management)  PAGEREF _Toc478585709 \h 10 HYPERLINK \l "_Toc478585710" Economic, legal, social, ethical and environmental Considerations  PAGEREF _Toc478585710 \h 11 HYPERLINK \l "_Toc478585711" Project Management (PM)  PAGEREF _Toc478585711 \h 12 HYPERLINK \l "_Toc478585712" Conclusion  PAGEREF _Toc478585712 \h 12 HYPERLINK \l "_Toc478585713" List of References  PAGEREF _Toc478585713 \h 14 HYPERLINK \l "_Toc478585714" APPENDIX  PAGEREF _Toc478585714 \h 16 HYPERLINK \l "_Toc478585716" Acronyms  PAGEREF _Toc478585716 \h 16 HYPERLINK \l "_Toc478585717" APPENDIX B  PAGEREF _Toc478585717 \h 17 HYPERLINK \l "_Toc478585718" Gant chart  PAGEREF _Toc478585718 \h 17 HYPERLINK \l "_Toc478585719" Estimated Project Costs  PAGEREF _Toc478585719 \h 19Exploiting Lean Manufacturing Techniques to Improve Street Lighting ManagementAim(s) and Objectives The aim and objectives of the study are as follows:Study Aim To critically identify the loose ends in street lighting management and as a result, facilitate the overall improvement by finding management solutions which will foster continuous improvement in the said management activities. Objectives To identify the state of street li...

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.